Lumding Town, Assam, was once the starting point of one of India’s slowest express trains. After 1992, the Barak Valley Express took about 12 hours 30 minutes to cover 213 km from Lumding to Silchar, averaging roughly 17 km/h as it climbed through the North Cachar Hills on a metre-gauge line, stopping at Haflong, Jatinga and other hill stations. It ran until September 2014, when the line closed for conversion to broad gauge.

That story says a lot about Lumding, a railway town that has long been the gateway from the Brahmaputra Valley into the hills and on to Barak Valley and Tripura. Here’s where it sits, how it connects, and what’s nearby.

Lumding Town, Assam

Lumding Overview

Detail Information
District Hojai, Assam
Civic body Lumding Municipal Board
Population (2011) 31,347
PIN code 782447
Railway station Lumding Junction, on Station Road
Railway division Lumding, Northeast Frontier Railway (created 1 May 1969)
Division ranking 2nd biggest station in the division, after Guwahati
Lines Guwahati–Lumding, Lumding–Dibrugarh, Lumding–Badarpur
Hill line converted to broad gauge 2015

A Town Built Around the Railway

  • Divisional headquarters: Lumding has been the headquarters of the Lumding railway division since 1 May 1969.
  • Jurisdiction: The division covers the main line from Agthori to Furkating, branch lines such as Chaparmukh–Silghat and Senchoa–Moirabari, and the hill section south to Barak Valley.
  • Metre-gauge past: Lumding once had a metre-gauge locomotive shed, used for trains on the hill line.

How the Railway Reached Lumding

  • 1896–1898: The Assam Bengal Railway opened the Comilla–Akhaura–Kulaura–Badarpur section.
  • 1903: The line was extended to Lumding, according to the station’s Wikipedia page.
  • 1914: Another source says the Guwahati–Lumding–Badarpur metre-gauge line was completed in 1914. The earlier date may refer to the southern section, and the later one to the full route through the hills.
  • 1992: Guwahati–Lumding was converted to broad gauge, making Lumding the terminus for hill-line trains.
  • By 1997: The whole Guwahati–Lumding–Dibrugarh–Tinsukia sector was on broad gauge.
  • 27 March 2015: The first goods train ran on the newly converted Lumding–Silchar line.
  • 10 July 2019: Doubling of the 45 km Lumding–Hojai stretch was completed.

Getting to Lumding Town, Assam

By Rail

  • Lumding Junction: A major junction with trains towards Guwahati, Dibrugarh, Silchar and Agartala.
  • Towards Tripura: Before 2015, the 413 km route from Lumding to Agartala was metre gauge. After conversion to broad gauge in 2016, Agartala connected directly to Guwahati and the rest of India.
  • Hill line: The Lumding–Badarpur section passes through Langting, Maibang, Lower Haflong and Jatinga.

By Road

Roads connect Lumding with Hojai, Lanka and Diphu, and on to NH 27 for Guwahati and other parts of Assam.

By Air

Guwahati is the main airport for the region. Silchar is another option for travellers heading south.

Nearby Areas

  • Hojai: The district’s commercial centre, known for agarwood, with a station on the Guwahati–Lumding line.
  • Sankardev Nagar: The Hojai district headquarters.
  • Lanka: A town linked with the 14th-century poet Madhava Kandali.
  • Haflong and Jatinga: Hill stations on the line south, in Dima Hasao district. Jatinga is known for its mysterious bird phenomenon.
  • Diphu: The headquarters of Karbi Anglong district, on the Lumding–Dibrugarh line.
  • Badarpur and Silchar: In Barak Valley, reached by the converted hill line.

FAQs

Q1. Why is Lumding important?

A. It’s the headquarters of the Lumding railway division, created on 1 May 1969, and a key junction linking Guwahati, Upper Assam, Barak Valley and Tripura.

Q2. When was the Lumding–Silchar line converted to broad gauge?

A. Conversion was completed in early 2015. The first goods train on the new broad-gauge line ran on 27 March 2015.

Q3. Which district is Lumding in?

A. Lumding is in Hojai district, Assam, and is run by the Lumding Municipal Board.

Q4. What was the Barak Valley Express?

A. A metre-gauge train from Lumding to Silchar that took about 12.5 hours to cover 213 km through the hills. It stopped running in September 2014 for gauge conversion.

Leave a Reply

Your email address will not be published. Required fields are marked *